Concrete mixer is one of the equipment of a large commercial concrete batching plant, as an important part of the concrete batching plant, in the operation of the time should pay attention to several points:
First, the concrete mixer must be placed in the flat position, because the mixer is used before and after the wooden block the wheel, placed in the flat position, in order to prevent the machine move at run time.
Second, concrete mixer need to implement two leakage protection, before the normal operation of the machine, must check after the empty normal operation test, can really put into use, it need to detect the equipment of the stirring barrel speed is normal, also need to adjust the rotating wheel and wheel transmission ratio after after the detection, it can really run.
Third, before use, must check the direction of rotation of the stirring barrel and keep with the arrows pointing in the direction of whether, if there is inconsistency, should immediately adjust the direction of rotation of the line, restore normal.
Of course, in order to ensure the normal operation of the concrete mixer, there are a lot of things need to pay attention to these, we need to constantly sum up, and try to find the user to explore, so as to truly create value.