After the concrete mixing station is finished, the mechanic should strengthen the inspection of the mechanical equipment, and make a record of the account, and find out the problems in time to ensure the normal operation of the concrete mixing station.
First, check the mixing main equipment to see if there is any abnormal noise in the concrete mixer machine; whether the grease pump is normal, whether the oil level of the gearbox is normal, whether there is oil leakage, whether the door opening mechanism is flexible, whether there is leakage or not; . In case of problems, it is necessary to register and repair in time.
Secondly, whether the actuators, cylinders and valves operate normally, whether there is air leakage; whether the measuring buckets enter and exit the soft joints are damaged or leaked; the water scale and the admixture are said to have any overflow phenomenon; No wear, whether the concrete hopper liner is damaged. If damage is found, replace it in time.
In addition, the electrician should strengthen the inspection work of electrical equipment, the contactors, relays in the power cabinet, whether the contacts of the open circuit breaker are normal, and whether there is a break; button on the console, knob, self-locking is flexible, whether the signal indicator is normal; whether the wires and control wires are connected properly, whether there is aging phenomenon; whether the PLC controller works well, whether the connector is loose or not.
Only by strengthening the daily maintenance and maintenance of the concrete mixing plant can we ensure the service life of the concrete mixing plant, improve its production efficiency and produce high quality concrete!