With the continuous advancement of the commercialization of concrete and the strengthening of the supervision of the mixing station in the country, many unqualified and environmentally-friendly mixing stations have gradually been cleared out of the market, leaving the natural strong, but facing the parties. The strength gradually gathers. In order to continue to gain market recognition, we still need a complete production management system to improve our competitive strength. Today we will look at the five major factors in the production and management of concrete mixing plants.
1. Concrete mixing station staffing
Personnel configuration is very important for the mixing station. It is necessary to ensure normal production users and not to waste personnel. According to the scale of the mixing station, different job categories are set and different numbers are configured.
2, concrete mixing plant equipment
For concrete production, the mixing station is the largest equipment, all production activities are carried out around the mixing station, so the equipment management is very important to ensure the normal operation of the machine, requires regular maintenance, and needs to master certain Mixing station maintenance technology, to achieve small problems without asking for people, big mistakes are not wrong.
3. Production of concrete mixing plant
For concrete production, all parts need to be coordinated. From the sales order acquisition to the production part, the production task is issued. The laboratory produces the relevant cooperation ratio. The mixing station operator inputs the production task to start production, and the concrete arrives at the construction site. Once there is any leak in the middle link, the problem of irreversible car production will be produced.
4. Concrete mixing station fleet management
Many mixing stations have their own fleet, including mixer trucks and pump trucks. These two vehicles are important carriers for concrete transportation and construction. Therefore, fleet management needs to develop an effective system to improve the production efficiency of the entire mixing station. It is necessary for the driver of the mixer to transport the concrete to the construction site on time. At the same time, it is necessary to maintain the maintenance and repair of the vehicle on a daily basis.
5. Concrete mixing station scheduling
Many times, several construction sites are constructed at the same time. If the number of mixers is limited, in order to ensure that all construction sites can be effectively constructed, it is necessary to schedule the most efficient dynamic management. At the same time, the mixing station and the driver are needed the next day. Work, make a rough plan, ensure production and transportation in an orderly manner.
In general, whether the concrete mixing plant can live for a long time and maintain efficient operation, its production and management requires a lot of substantial exploration, and at the same time develop a management road suitable for its own mixing station.